Substation Relocation
July 2010. This involved the largest cable 630mm single cores from substation 433V output. Production required Generator connecting while Substation was moved. This required a LOT of planning with both the factory director and NEDL who moved the HV equipment and powered down/up. Again out of hours requirement was met and job completed earlier than expected due to perfect planning.